Land Preliminary Evaluation Report-v2.3

Land Preliminary Evaluation Report Generator

Land Preliminary Evaluation Report Generator

For Industrial and Logistics Park Development

1. SITE IDENTIFICATION

Site ID
Site Google Coordinate
Location Circle
Land Parcel Size Range (Approx) - In Acres

2. REGIONAL IDENTIFICATION

PART I

District
Taluk
Village

PART II

District
Taluk
Village

3. ACCESSIBILITY

Distance from the Nearest Highway/Main Road
Last Mile Connecting Road Pattern
Road Width of Last Mile Connecting Road - On Record (In Feet)
Road Width of Last Mile Connecting Road - Actual (In Feet)

4. INFRASTRUCTURE DISTANCES

Note: Distances will be automatically calculated when you enter the Site Google Coordinate above.

Click "Calculate Distances" button to compute all distances.

Chennai Port
Ennore Port
Dry Port
ORR@Poonamallee
ORR@Nemili(Avadi)
ORR@Alamadhi(Redhills)
ORR@Sholavaram
CPRR@Sriperumbudur
CPRR@Thiruvallur(Mannur)
CPRR@CTH Road
CPRR@Tamaraipakkam
CPRR@Karanodai
BCE@Sogandi(Sunguvarchatram)
CTE@Uthukottai
CTE@Vadamadurai(Periyapalayam)
CTE@Karanodai
Distance Calculation Method: All distances are calculated "as the crow flies" (straight-line distance) using geographical coordinates. Actual travel distances by road may vary and could be longer depending on road network and terrain.

5. DIGITAL ASSETS

Site Google Location (URL)
Site Combined Sketch - PDF (URL)
Site Combined Sketch - CAD (URL)
Village Map (URL)
Site Pictures (URL)
Site Video (URL)
Others (URL)

6. KEY DUE DILIGENCE FINDINGS

Official Category
Site Frontage (In Feet)
Site Level Compared to Road In-front
Encroachment within boundary
Yes
No
Not Sure
HT Tower Line within Boundary
Yes
No
Not Sure
HT Tower Base within Boundary
Yes
No
Not Sure
Water Channel within Boundary (Revenue)
Yes
No
Not Sure
Water Body within Boundary (Revenue)
Yes
No
Not Sure
Water Body within Boundary (Onsite)
Yes
No
Not Sure
Government / Poromboke Land within site
Yes
No
Not Sure
Land Acquisition Proposed
Yes
No
Not Sure
Not Covered under Land Ceiling Act, 1978
Yes
No
Not Sure
Comes under Land Reforms Act, 1961
Yes
No
Not Sure
Quarry / Stone Crusher within 500m
Yes
No
Not Sure
Burial / Cremation Ground within 30m
Yes
No
Not Sure
Pertains to ASI Purview
Yes
No
Not Sure
Forest within 500m
Yes
No
Not Sure

7. CONDITIONS

Land Use Conversion
Required
Not Required
Maybe
Extent of Land Use Conversion Required
Full
Part
PWD Permission for Culvert
Required
Not Required
Maybe
Court Order (minor property)
Required
Not Required
Maybe
Land Swapping - Anandheenam
Required
Not Required
Maybe
Land Swapping - Temple Land
Required
Not Required
Maybe
SIPCOT NOC
Required
Not Required
Maybe
Highways NOC
Required
Not Required
Maybe
ASI NOC
Required
Not Required
Maybe
ONGC NOC
Required
Not Required
Maybe
Land Acquisition NOC
Required
Not Required
Maybe
Other Conditions

8. ADDITIONAL INFORMATION

Additional Notes

Download Your Report

Your report is ready to download as a PDF file.